Software development and testing.<br />
<br />
Development and debugging of software for the miner management system.<br />
<br />
· Preparation of debugging tools for the study and maintenance of software on the miner system.<br />
<br />
· Software development for the system.<br />
<br />
· Debug software on the system.<br />
<br />
· Development of software documentation for the system.<br />
<br />
Production of functional samples (31 pcs.)<br />
<br />
· Provision of a set of functional samples.<br />
<br />
· Manufacturing of printed circuit boards.<br />
<br />
· Provision of body parts, made by prototyping.<br />
<br />
· Assembling electronic modules of functional samples in an experienced design bureau (31 pcs.). Assembling in cases 3 pcs. or testing mechanical effects.<br />
<br />
· Programming, testing of operability, tuning of electronic modules of functional samples, assembly into cases (28 pieces).<br />
<br />
10 web: markscheider.io; mail:
[email protected]<br />
<br />
Tests of functional samples.<br />
<br />
· Development of a program and testing methodology.<br />
<br />
· Carrying out the test.<br />
<br />
· Adjustment of the schematics and documentation on the results of the test, verification of<br />
<br />
functional samples.<br />
<br />
· Software adjustment based on test results.<br />
<br />
· Correction of design documentation for electronic modules based on test results.<br />
<br />
Production of prototypes for preliminary tests (4 pieces). Provision of preliminary tests.<br />
<br />
Development and manufacturing of equipment.<br />
<br />
· Development of design documentation for rigging.<br />
<br />
· Correction of design documentation for rigging according to test results.<br />
<br />
· Manufacturing of equipment.<br />
<br />
Development and manufacturing of the automated means of industrial control (CAD).<br />
<br />
Production of 10 prototypes for acceptance and operational tests.<br />
<br />
Acceptance tests.<br />
<br />
· Development of the acceptance test program.<br />
<br />
· Conducting the acceptance test (5 pcs.).<br />
<br />
· Correction of DD, TU, ED and software according to the results of the acceptance test..<br />
<br />
Operational tests.<br />
<br />
· Performance testing.<br />
<br />
· Correction of DD, TU, ED and software according to the results of the operational test.<br />
<br />
Manufacturing of 3 prototypes for certification tests..<br />
<br />
· Programming, testing of operability, tuning of prototypes, delivery of OAKCP.<br />
<br />
· Conducting a certification test, obtaining certificates.<br />
<br />
Carrying out the acceptance commission.