The first 5 nodes will be installed strategically in populations with more than 5000 population where fiber optics do not currently exist. The<br />
<br />
nodes will be installed in the provinces of Galicia.<br />
<br />
Depend of the raised, we install 5 more nodes, making a total of 10 operating nodes by the end of 2018<br />
<br />
Cederis portal design<br />
<br />
Ripe ips, DNS,